At every operator, we apply its procedures. Here is what our engineers respect on all sites, and what we provide to get them onto site.
What we comply with on all sites
- Access
We announce every intervention in advance, with the names of the engineers, under the operator’s ticket or work order number, through an authorised contact of the tenant. We show photo ID at the entrance.
- Security induction
We attend the security induction, at the first visit or at every visit depending on the site: evacuation instructions, restricted areas, what to do when an alarm sounds.
- Badge
Named badge, worn visibly, returned on exit, never lent.
- Escort
We follow the route and escort arrangements imposed, and we do not move around alone outside the designated area.
- Rules in the room
No food or drink, no undeclared equipment, tools and cable routing as the site instructs. Cardboard, pallets and packaging stay outside the room: we unpack in the designated area. No photos outside your rack, and only if the operator allows it.
- Fire detection
Aspirating smoke detection and automatic gaseous fire suppression: our engineers know what to do when the alarm sounds and evacuate without delay. Inhibiting a zone is decided and carried out by the operator, never by us.
- Protective equipment
We wear the protection the operator requires for the zone and the work: safety shoes and other items.
- Prevention plan and permits
The prevention plan organises joint working between the operator and us (risks, measures, contacts): drawn up together after a prior inspection; it must be in writing above 400 hours over twelve months or for hazardous work, and in practice most operators require it in writing (articles R. 4512-2 and R. 4512-7 of the French Labour Code). The operator’s permit (hot-work permit, work at height, work near technical installations) authorises a specific high-risk operation, case by case.
- Method statement and certifications
For a delicate operation, we supply the written method statement and the proof of authorisation or training that the operator requires.
- Confidentiality
What is seen in a data centre stays there: we sign a confidentiality agreement on request.
If you are the operator
If you are the operator, we work as a provider, under your procedures, your work orders and your windows. We follow your security induction and your site rules, we work with your prevention plan, we inhibit nothing without your instruction, and our reports come back to you. Your installations (power, cooling, fire detection, the operator’s cabling): we touch them only on your instruction.
What this means for you as a tenant or integrator
You remain the operator’s point of contact: access to your rack is declared under its procedure, by a contact you have authorised, with a ticket number. We comply with it, we never try to bypass it, and we tell you what needs to be supplied when the intervention is scoped. If what we find on site does not match the request, we stop and call you.
Content written by the Full Connection field team and approved by Karim Bouacida, head of the company.
Frequently asked questions
Are the rules the same in every data centre?
No. They are similar, but each operator has its own access procedures, zones and forms. The operator’s procedures prevail.
Who declares the engineers to the operator?
Depending on the colocation contract, the tenant or its provider, following the operator’s procedure. We tell you what information to provide when you make the request.
Prevention plan or work permit: what is the difference?
The prevention plan governs the presence of an outside company on the operator’s site, with the risks and measures agreed together before work starts. The permit authorises a specific high-risk operation, such as hot work or work at height. The first is general, the second is occasional.
An intervention to prepare at an operator’s site?
Describe the site, the window and the objective.
By phone: 07 76 31 97 87